Free tool · Biotech runway simulator

Will your cash last until your next milestone?

Enter your cash, monthly burn, next R&D milestone and expected financing. See your runway, the cash left at the milestone and the funding you would still need, in three scenarios.

Run your numbers

Calculated in your browser. Nothing you enter is sent to Helix or any third party.

Your biotech

Amounts in EUR millions. Change any value; results update as you type.

€M
€M / month

Next value-creating milestone

months
€M

Spread evenly until the milestone; exclude costs already in burn.

Financing and uncertainty

€M
months

Month 0 is today. The model assumes the round closes on time.

Month 0, as YYYY-MM. Set from your browser's clock; used only to print dates.

The file is created in your browser. Nothing is saved: reloading resets the inputs, so export to keep them.

Funded to Preclinical proof of concept (month 12): in the base case, cash never goes below zero before the milestone.

Results

Funded to milestone

Funded to Preclinical proof of concept (month 12): in the base case, cash never goes below zero before the milestone.

Cash runway
20.3 months
Until the balance goes below zero. Without the expected financing: 13.2 months.
Cash at milestone
€2.34M
at month 12, including expected financing.
Additional funding needed
€0.00M
The deepest cash deficit before the milestone, beyond the expected financing.
Cash balance, three scenarios€M · 36 months
Unfunded deficit-10-5050122436Months€MZero cashMilestone, m12
  • Optimistic
  • Base case (thick)
  • Downside (dashed)
Show the monthly figures
MonthDateBaseOptimisticDownside
0—€4.50M€4.50M€4.50M
1—€4.15M€4.18M€4.12M
2—€3.81M€3.86M€3.74M
3—€3.46M€3.55M€3.36M
4—€3.11M€3.23M€2.98M
5—€2.77M€2.91M€2.60M
6—€2.42M€2.59M€2.22M
7—€2.07M€2.27M€1.84M
8—€1.73M€1.96M€1.46M
9—€3.38M€3.64M€3.08M
10—€3.03M€3.32M€2.70M
11—€2.69M€3.08M€2.32M
12—€2.34M€2.84M€1.93M
13—€2.06M€2.61M€1.55M
14—€1.78M€2.37M€1.17M
15—€1.50M€2.13M€0.79M
16—€1.22M€1.89M€0.41M
17—€0.94M€1.65M€0.03M
18—€0.66M€1.42M−€0.35M
19—€0.38M€1.18M−€0.68M
20—€0.10M€0.94M−€1.02M
21—−€0.18M€0.70M−€1.36M
22—−€0.46M€0.46M−€1.69M
23—−€0.74M€0.23M−€2.03M
24—−€1.02M−€0.01M−€2.36M
25—−€1.30M−€0.25M−€2.70M
26—−€1.58M−€0.49M−€3.04M
27—−€1.86M−€0.73M−€3.37M
28—−€2.14M−€0.96M−€3.71M
29—−€2.42M−€1.20M−€4.04M
30—−€2.70M−€1.44M−€4.38M
31—−€2.98M−€1.68M−€4.72M
32—−€3.26M−€1.92M−€5.05M
33—−€3.54M−€2.15M−€5.39M
34—−€3.82M−€2.39M−€5.72M
35—−€4.10M−€2.63M−€6.06M
36—−€4.38M−€2.87M−€6.40M

Three possible futures

  • Optimistic

    23.9 months

    cash runway

    Milestone:
    month 10
    Cash at milestone:
    €3.32M
    Funding needed:
    €0.00M

    Reaches the milestone

  • Base case

    20.3 months

    cash runway

    Milestone:
    month 12
    Cash at milestone:
    €2.34M
    Funding needed:
    €0.00M

    Reaches the milestone

  • Downside

    17.0 months

    cash runway

    Milestone:
    month 18
    Cash at milestone:
    −€0.35M
    Funding needed:
    €0.35M

    Misses the milestone

  • Optimistic: burn 15% lower, milestone 2 months earlier (month 1 at the earliest). Downside: burn 20% higher, milestone delayed by the chosen delay.
  • Milestone-specific costs stay the same in total and are spread over each scenario's own timeline: a delay raises cost only through the monthly burn.
  • The financing date is the same in every scenario. These factors are illustrative assumptions, not benchmarks.

How it is calculated

The model works month by month, from today (month 0) to at least month 36, and further when the downside milestone falls later (up to month 48). Each month, the balance moves by the expected financing if it arrives that month, minus the monthly net burn, minus an equal share of the milestone-specific cost until the milestone. Financing that arrives in a month pays that month's spending.

Cash runway is the time until the balance first goes below zero, interpolated within the month and shown truncated to one decimal, never rounded up. A balance of exactly zero is not a shortfall.

Additional funding needed is the deepest cumulative deficit between today and the milestone, beyond the financing you expect. If the round closes after cash runs out, the gap before it still counts: the company would have had no cash in between.

Scenarios. Optimistic: burn 15% lower and the milestone 2 months earlier. Downside: burn 20% higher and the milestone delayed by the delay you choose. The milestone cost is the same total in every scenario, spread over that scenario's own timeline, and the financing date does not move. These factors are illustrative assumptions, not benchmarks.

Below zero, the chart shows an unfunded deficit: the amount that would have to be raised, not cash that can be spent.

What the model leaves out

Built by the Atlas team

Cash is one number. The evidence behind your milestone is the rest.

Atlas keeps the trials, papers, patents and funding around your program in one place, each with its source, so the next milestone decision rests on what is known.

An illustrative cash-flow model, not financial, investment or regulatory advice. The results depend entirely on the figures you enter and on the stated assumptions.